You cannot select more than 25 topics Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.

3.9 KiB

03 — Conteúdo canónico (fonte de verdade)

Extraído de input_files/Notas Site.docx e input_files/cronograma.png. Não inventar conteúdo. Idioma: inglês.

Identidade

  • Título: RESILIENCE — Residential Energy-Efficiency Strategies Incorporating Lifecycle Sustainability and Circular Economy
  • Acrónimo: RESILIENCE

Hero / meta

  • Project Team: Álvaro Gomes; Carla Henriques; Eugénio Rodrigues; Marco Fernandes; Patrícia P. Silva; Adélio Gaspar; Humberto Jorge; Marcos Tenente; Sona Mammadzada; Luís Ventura.
  • Dates: Start 28-07-2025 · End 26-07-2028
  • Total Eligible Cost: 215.308,80 €
  • EU Financial Support: 183.012,48 €
  • National Financial Support: 32.296,32 €
  • Project Code: 2023.17768.ICDT | COMPETE2030-FEDER-00888800; operação n.º 15224
  • Project DOI: https://doi.org/10.54499/2023.17768.ICDT

Synopsis

Goal — This project aims to bridge existing gaps in energy efficiency assessment methodologies by adopting a comprehensive and integrated approach that expands the assessment to other lifecycle phases of EE technologies, incorporates circular economy principles, and provides decision-makers with the tools they need to select the portfolios of measures that will be targeted by the EE programs.

Contribution — A comprehensive, decision-support framework combining:

  • Multiple Benefits of EE
  • Hybrid Lifecycle Analysis for full impact coverage
  • Circular resource assessment
  • Portfolio optimization for EE investment strategies
  • Decision-makers' preferences

Work Plan (tarefas)

# Tarefa
T1 Review of EE technologies and policies
T2 Review of indicators
T3 Selection of indicators
T4 Energy performance simulation
T5 Hybrid lifecycle analysis
T6 Model for designing energy efficiency funding policies
T7 Sustainability benchmark certificate

Cronograma (de cronograma.png) — janela 08/2025 → 07/2028 (36 meses)

Barras aproximadas por mês (1 = ago/2025). A afinar visualmente sobre a imagem.

Tarefa Início (mês) Fim (mês) aprox.
T1 1 5
T2 1 6
T3 5 9
T4 6 17
T5 13 24
T6 22 31
T7 31 36

Milestones: M1M10 distribuídos ao longo do projeto. Reports: 1st Progress Report, 2nd Progress Report, Final Report.

Posições exatas de milestones a refinar contra a imagem na fase de implementação.

Indicators

Journals

  • Tenente, M., Carvalho, T., Gomes, Á. et al. Integrating multiple impacts and lifecycle assessment in the evaluation of energy efficiency funding programs. Energy Efficiency 18, 96 (2025). https://doi.org/10.1007/s12053-025-10375-5

Conferences

  • A Critical Review of Policy and Multi-Criteria Indicators for Scaling Residential Building Resilience in Portugal's EPBD Implementation. ECEEE Summer Study, 2026.
  • Optimization of Energy Efficiency Renovations in Buildings: Unlocking Multiple Benefits Across Environmental, Economic, and Social Dimensions. ECEEE Summer Study, 2026.

MSc Dissertations

  • Cidades Inteligentes, Sustentáveis e Resilientes: Papel das CER — Proposta de uma Taxonomia.
  • Disseminação de renováveis variáveis e da eletrificação numa rede de distribuição — análise simulada de impactos e o papel da demand response.
  • Reservas Estratégicas de Energia Elétrica em Portugal — Estimativa considerando a Incerteza e a Gestão da Procura.

PhD Thesis

  • (sem entradas no documento)
  • INESC Coimbra — Instituto de Engenharia de Sistemas e Computadores de Coimbra
  • ADAI — Associação para o Desenvolvimento da Aerodinâmica Industrial
  • IPC ISCAC — Instituto Politécnico de Coimbra (ISCAC)

COMPETE2030 · FEDER (EU) · República Portuguesa — com montantes EU/Nacional acima.